Risk Management · 2025
In this section2 topics
Risk Management Policy & Plan
Policy & Plan Description
Risk Management Policy
The Company places the importance on managing risks that may arise from both external and internal factors which may affect to the business operations. And also setting policies and management plans for both strategic and operations of the Company to dealing with those impacts effectively. According to the principles of enterprise risk management (ERM: Enterprise Risk Management). And risk management framework of COSO (The Committee of Sponsoring Organizations of the Tread Way Commission). These are both international standard risk management guideline used as a guideline for the Company's risk management with successful and efficiently. Additional, the Board of Directors assigned the Risk Management Committee to determine policies, strategies, and frameworks for risk management in the Company's operations. Including, performing supervisory duties to follow up with departments’ operating complied with risk management framework. Through the Audit Committee to review the Company's operations have appropriate risk management and monitoring, effective Including linking to the Company's internal control as well.
Risk Management Structure
The Company has risk management structure which could be divided into two levels. Consists of risk management at the enterprise level and department level as follows:
Enterprise level, Risk Management Committee responsible for setting policy, strategy and framework for risk management of the Company. Including, supervision and monitoring for departments operation followed by the risk management framework. Evaluating and reporting to the Board of Directors through Audit Committee on a quarterly basis. In order to report risk status of the Company operation are complied with policy appropriately. Moreover, the Risk Management Committee has responsibility to review risk policy annually and propose it to the Audit Committee and the Board of Directors for approval if there are any changes.
Departmental level, Risk Management and all employees are risk owners and are responsible for identifying events, assessing the likelihood, and analyzing the severity of potential impacts on business operations. Risks that may affect the achievement of the Group's objectives and strategies are managed promptly and continuously by comprehensively and timely identifying risks and finding ways to prevent and control them to manage those risks to an acceptable level. The status of risks at the department's operational level is reported to the Board of Directors through the Risk Management Committee on a quarterly basis.
In addition, the company requires all departments to conduct a self-assessment of the adequacy of their internal controls through the Control Self-Assessment (CSA) tool. In 2025, audits will be conducted on the control of subcontractors and asset control to ensure confidence in the adequacy and effectiveness of internal controls over these processes. The Group also conducts internal control audits by an external Internal Audit unit and quality assessments for both ISO 9001:2015 and ISO 45001:2018 to control risks at the operational level to ensure compliance with established policies and plans, including compliance with the acceptable level of risk as defined in the risk management framework set by the Risk Management Committee.
Risk Assessment Principles and Processes
The company has quality risk management processes, guidelines, and measures that are internationally recognized and sufficient, including identification, analysis, assessment, prioritization, management, control, monitoring, reporting, evaluation, and continuous communication of risk information throughout the organization. Management and all employees are risk owners, responsible for identifying and assessing the risks of their respective departments, as well as defining appropriate measures to manage risks covering all of the Company's activities.
This includes analyzing and identifying enterprise-level risk issues, assessing the likelihood and impact of risks to assess overall enterprise risk, and defining Key Risk Indicators (KRIs), Risk Appetite, and Risk Tolerance levels to monitor and ensure that the Group's risks are appropriately managed. The management is informed if there are risks that cannot be managed to an acceptable level or if there are risk management activities that cannot be implemented. A review and adjustment of risk management activities are conducted to ensure they are appropriate and practical.
The Company has a risk appetite framework that encompasses 7 areas:
1. Strategic Risk,
2. Marketing Risk,
3. Business as Usual Risk,
4. Financial Risk,
5. Emerging Risk,
6. Cyber Security Risk, and
7. Compliance Risk, including Sustainability (ESG issues)
Risks to the Company's Business Operations
Risk Register
| Risk Name | Risk Characteristics | Consequences | Management Measures | Related Risk Factors |
|---|---|---|---|---|
| Risk of dependence on senior management | Risk Factors from Reliance on Senior Executives Since its establishment and operation to the present, the Group has experienced continuous growth, a result of the trust and confidence from clients in entrusting it with large-scale construction projects, both domestically and internationally. This success is significantly supported by the role of senior executives, particularly C-Level executives, who possess extensive experience in the energy construction industry, profound knowledge, expertise, and strong business networks. They are responsible for setting strategic directions, overseeing key project implementations, and managing relationships with major clients. The organization's reliance on such senior executives may pose a risk in cases where key personnel are unable to perform their duties, whether due to health reasons, resignation, or other unforeseen events. This could lead to delays in strategic decision-making, a lack of continuity in project management, potential impacts on customer and partner confidence, and may also affect the company's operational performance and competitiveness in the short to medium term. However, as of December 31, 2025, the company has four senior executives (C-Level) who continue to perform their duties in their respective departments, and none have reached retirement age. The Group assesses that this risk is manageable, with appropriate risk management guidelines and contingency plans in place to support business continuity. The Group recognizes the importance of senior executive positions, which play a crucial role in strategic formulation and organizational drive. Therefore, it prioritizes systematic management of personnel risks at the executive level to ensure continuous and stable operations, aligned with the organization's long-term growth objectives. | Reliance on senior executives poses an organizational structural risk. Without a proper succession plan and knowledge management system, it could significantly impact business continuity, operational stability, and the confidence of the company's stakeholders, as follows: 1. Impact on Strategy and Organizational Direction
| The Group recognizes the importance of managing Key Person Risk, which may affect business continuity, strategic formulation, and stakeholder confidence. Therefore, systematic measures have been established as follows: (1) Preventive Control Measures 1.1 Preparation of Succession Plan 1.2 Systematic Qualification Definition and Selection Process Require the Human Resources Department to identify the necessary competencies for each executive position and to recruit/select Candidate Successors from within the organization, considering job characteristics, responsibilities, company expectations, and establish criteria and tools for evaluating and selecting suitable potential candidates. (2) Development & Capability Building Measures 2.1 Preparation of Individual Development Plan (IDP)
2.2 Knowledge and Experience Transfer Promote systematic knowledge transfer from current executives to successors to mitigate the risk of losing individual-specific knowledge. (3) Monitoring & Governance Measures 3.1 Continuous Performance and Potential Assessment 3.2 Reporting to the Board of Directors Summarize the evaluation results and progress of the Succession Plan and submit a report to the Board of Directors for consideration and oversight of the succession selection process in each functional area to ensure transparency and appropriateness. | 737 · Other name: Risk of dependence on senior management · Description: Other · Info category: STRATEGIC_RISK |
| Strategic and Business Operational Risks | Risk factors arising from reliance on a single industry for revenue. The Group's primary revenue is derived from large-scale construction projects for project owners and main contractors in the oil, natural gas, refinery, and petrochemical industries. These projects are typically project-based, requiring significant participation in bidding processes. Consequently, the Group's revenue may fluctuate depending on its competitiveness and success in winning bids at different times. Furthermore, the aforementioned industries may be affected by several external factors, such as the global economic situation, energy price volatility, geopolitical uncertainties, changes in government regulations and policies, as well as the trend of transitioning from traditional energy to clean energy. These factors could lead clients to modify, review, postpone, or delay project investments from their original plans, potentially impacting the continuity and level of the Group's revenue at certain times. | If the investment plans of customers in the energy and petrochemical industries are adjusted, postponed, or delayed, it may result in the Group being unable to recognize revenue as planned, leading to greater volatility in revenue and operating results for each accounting period than anticipated. Furthermore, increased competition in project bidding may subject the Group to price pressure, which could affect the gross profit margin of projects if the company cannot manage costs efficiently. In the event that a project's start date is postponed or cancelled, it may affect resource management, such as the allocation of personnel, machinery, and working capital, leading to fixed costs that still need to be borne, even if revenue from such projects cannot be recognized as planned. Furthermore, if such fluctuations persist for an extended period, it may impact cash flow, financial liquidity, and the Group's ability to plan future investments. | To manage the risks arising from project-based revenue reliance and the volatility of investment plans in the energy and petrochemical industries, the Group has established a risk management framework under the Enterprise Risk Management (ERM) process. This involves consistent identification, assessment, monitoring, and review of risks, along with the implementation of appropriate control measures, as follows: 1. Revenue Diversification The Group aims to reduce its reliance on any single customer or industry by expanding its customer base to related industrial sectors and considering opportunities in projects with continuous work characteristics to enhance long-term revenue stability. Project Portfolio and Backlog Management The company closely monitors the status of its backlog and customer investment plans, while appropriately managing the proportion of short-term, medium-term, and long-term projects to maintain revenue continuity and mitigate the impact of project postponements or delays. 2. Enhancing Competitiveness and Cost Control The company prioritizes the development of technical capabilities, safety standards, and project management efficiency, coupled with systematic cost control, to mitigate risks from price pressures and maintain appropriate profit margins. 3. Prudent Liquidity and Financial Position Management The company prepares advanced cash flow projections and closely manages working capital to ensure sufficient liquidity to accommodate revenue fluctuations, as well as delays in project initiation or delivery. 4. Monitoring External Factors and Proactive Strategy Adjustment The company continuously monitors global economic conditions, geopolitical fluctuations, energy price trends, and the direction of the clean energy transition to assess potential significant impacts on its financial position, operational performance, and cash flow, and is prepared to adjust its business strategies in line with changing environments. The company regularly reports and reviews these risks with the Board of Directors to ensure that risk management measures are adequate, appropriate, and aligned with the organization's risk appetite. | 734 · Description: Reliance on large customers or few customers · Info category: STRATEGIC_RISK |
| Risk from the volatility of construction material prices | Risk factors from the volatility of construction material prices The Group's business primarily involves construction projects, which require key construction materials such as steel, metal structures, system equipment, and specialized materials for the energy and petrochemical industries. Therefore, material costs are a significant component of project costs. Construction material prices may fluctuate due to external factors such as global economic conditions, energy price volatility, exchange rates, transportation costs, supply chain disruptions, and geopolitical events. Furthermore, delays or shortages of raw materials in the market may result in an inability to procure materials within the scheduled timeframe. | Fluctuations in construction material prices may result in project costs exceeding estimates, especially if the company has entered into a fixed-price contract, which could impact gross profit margins and operational performance. In the event of material shortages or delayed deliveries, projects may not proceed as planned, affecting revenue recognition, resource management, and the company's cash flow. This could also lead to additional costs from work acceleration or penalties as per contract terms. Should such situations occur continuously or significantly, it could impact the Group's financial position, operational performance, and competitiveness. | The Group recognizes that fluctuations in steel and construction material prices, as well as supply chain uncertainties, may impact the Company's profit margins, operational performance, and cash flow. Therefore, systematic risk management measures have been established under the enterprise risk management framework, as follows: 1. Cost estimation and careful consideration of bid prices The preparation of bid prices for each project is based on the Company's internal cost database, compiled from past project experiences, coupled with an analysis of material price trends at the time of bidding, and an assessment of market conditions and potential fluctuations. Risk reserves are set aside in cases where key raw material prices may change significantly, to enhance cost accuracy and maintain appropriate profit margins. 2. Establishing contract terms to mitigate price risks The Company considers using appropriate contractual terms, such as implementing a Price Adjustment Clause in cases of high volatility, or entering into Price Lock-in agreements with partners, to mitigate risks from market price fluctuations. 3. Prudent procurement planning and supply chain management During the bidding process, the Company negotiates prices with suppliers in advance. Upon securing a project, purchase orders or contracts for key materials are issued at an appropriate time to mitigate price risks. Furthermore, the Company monitors raw material price trends from various domestic and international sources and closely analyzes supply chain situations to determine suitable procurement strategies. 4. Diversification of procurement sources and partner relationship management The Company diversifies its procurement sources and builds long-term relationships with key suppliers to avoid reliance on any single vendor and to enhance flexibility in material sourcing in the event of shortages. 5. Inventory management planning aligned with project schedules The Company plans procurement and manages inventory levels in alignment with construction schedules to mitigate risks of material shortages or delivery delays, which could affect project timelines and revenue recognition. The Company regularly monitors and reviews the effectiveness of these measures and reports to management and the Board of Directors to ensure that risk management is adequate, appropriate, and aligned with the organization's acceptable risk appetite. | 740 · Description: Shortage or fluctuation in pricing of raw materials or productive resources · Info category: OPERATIONAL_RISK |
| Risk of delayed work and failure to meet customer delivery deadlines. | The Group may face risks from project delays or failure to deliver work according to the schedule specified in the construction contract, which is classified as an Operational Risk with implications linked to contractual and financial risks. Such risks may arise from both internal and external factors, such as:
If the company is unable to proceed with the project or deliver the work on schedule, it may be subject to contractual penalties (Liquidated Damages) or claims for damages from the project owner, which could result in additional costs beyond those estimated in the construction plan. Furthermore, delays may impact revenue recognition, cash flow, and project profit margins, as well as potentially affect the Group's reputation, customer confidence, and long-term competitiveness if they occur significantly or continuously. | If the Group is unable to execute projects or deliver work within the contractual timeframe, it may have several impacts, as follows: 1. Financial and Operational Impacts The Company may incur contractual penalties (Liquidated Damages) or additional costs from expediting work, as well as increased indirect costs due to project extensions, which could lead to a reduction in the project's gross profit margin and impact overall operational performance. 2. Impacts on Revenue Recognition and Cash Flow Delays may postpone revenue recognition, affecting cash flow and potentially increasing the need for additional working capital. 3. Contractual Impacts and Disputes In the event of disputes regarding the causes of delays, it may lead to contractual disputes, negotiations for damages, or legal proceedings, which could result in additional costs and administrative burdens. 4. Impacts on Reputation and Customer Confidence Significant delays in project delivery may affect customer confidence and impact future business opportunities. 5. Long-term Strategic Impacts If delays occur continuously or involve large-scale projects, they may significantly impact the Group's financial position, operational performance, and competitiveness. | To manage the risks of project delays and non-compliance with delivery schedules, the Group has established systematic control and monitoring measures under its enterprise risk management framework, as follows: 1. Rigorous Project Planning and Schedule Control. The Company prepares detailed project plans from the outset, sets clear timeline objectives, and regularly monitors progress against the plan to promptly detect deviations and implement corrective actions. 2. Systematic Contract Management. The Company reviews contract terms before signing and closely monitors changes in the scope of work (Variation Orders) to prevent impacts from design or condition changes that may cause delays. This also includes preparing supporting documents to protect the Company's interests in cases of force majeure or delays not caused by the Company. 3. Resource and Subcontractor Management. The Company plans the allocation of personnel, machinery, and materials in accordance with the work plan, and establishes criteria for selecting and evaluating subcontractors to ensure that work can be performed according to specified quality standards and timelines. 4. Procurement and Supply Chain Management. The status of material and equipment procurement is closely monitored, and contingency plans are established in case of delivery delays to mitigate risks that may affect the project's main schedule. 5. Monitoring and reporting risks to management and the Board of Directors. Project progress and significant risk issues are regularly reported to management and reviewed at the Board of Directors level to ensure appropriate and timely corrective actions or support measures can be determined. The Company continuously evaluates and reviews the effectiveness of these measures to ensure that the impact of delays can be reduced to an acceptable level and does not significantly affect the financial position, operational performance, and reputation of the Group. | 755 · Other name: Risk of delayed operations and failure to meet customer delivery deadlines. · Description: Other · Info category: OPERATIONAL_RISK |
| Safety risks arising from construction accidents that could disrupt operations. | The Group's core business involves providing construction services to clients in the energy and petrochemical industries. The nature of this work involves the fabrication and installation of highly complex steel structures, piping systems, and equipment. Operations are divided into activities performed at the company's factory, which include cutting, welding, and assembling steel structures and piping systems, as well as operations at client construction sites, which may be high-risk areas subject to stringent safety regulations. Given the nature of such work, which requires heavy machinery, work at height, hot work (welding/cutting), electrical work, and operations in confined spaces or areas with flammable substances, if proper safety controls are lacking or errors occur due to the actions of employees or subcontractors, it could lead to accidents affecting lives and property, and may also result in temporary suspension of operations by project owners or regulatory bodies. In this regard, should construction accidents occur, whether in the factory or at the client's construction site, project operations may be disrupted, affecting project schedules and contractual delivery timelines, as well as increasing cost risks and legal liabilities, which could significantly impact the Group's operational performance and business continuity. | The occurrence of construction accidents, whether at the manufacturing plant or the customer's site, could have a significant impact on the Group in several ways, as follows: Operational impact
Financial impact
Legal and regulatory impact
Impact on reputation and trust
| The Group places the highest priority on managing safety, occupational health, and the working environment to prevent accidents and mitigate impacts that could disrupt operations. Risk management measures are systematically defined as follows: 1. Preventive Control Measures
2. Detective Control Measures
3. Corrective & Business Continuity Plan Measures
| 749 · Description: Safety, occupational health, and working environment · Info category: OPERATIONAL_RISK |
| Financial Risk | The Group primarily operates by providing construction services to clients in the energy and petrochemical industries, which involve large-scale projects with high contract values, long project durations, and payment terms based on work progress (Progress Payment). This business model necessitates the Company to utilize substantial working capital to pre-finance expenses such as material costs, labor wages, and subcontractor fees, before receiving payments from clients. Consequently, if clients encounter liquidity issues, postpone investments, delay projects, or default on scheduled payments, this could directly impact the Company's cash flow and its ability to manage liquidity. Furthermore, projects in the energy and petrochemical industries are often linked to global economic conditions, energy prices, and industrial sector investments. Should significant fluctuations occur, this may lead to employers delaying payments or altering contractual terms. Furthermore, the construction business relies on funding from financial institutions to support working capital and issue various guarantees. Should operating cash flow deviate from projections, this may affect the Company's ability to repay loans, interest, or comply with financial covenants under credit agreements. This could lead to credit line restrictions, accelerated debt repayment demands, or an impact on the confidence of financial institutions. | The Group's core business is providing construction services for large-scale projects with high contract values and requiring significant working capital. If customers default on payments or make significantly delayed payments, it may affect the company as follows: 1. Impact on liquidity and working capital
| The Group has established prudent financial risk management policies and practices, covering stages from before participating in bids, during project execution, and in cases of payment defaults, to limit impacts on the Company's liquidity and financial stability, as follows: (1) Preventive Control Measures 1.1 Prudent Client Selection (Client Screening Policy) 1.2 Appropriate Payment Term Definition
(2) Detective Control Measures 2.1 Project-Specific Payment Status Monitoring 2.2 Phased Debt Collection Plan 2.3 Reporting to Management (3) Liquidity Support and Management Measures
| 763 · Description: Default on payment or exchange of goods · Info category: FINANCIAL_RISK |
| Foreign exchange rate volatility | Construction operations in some projects of the Group involve ordering imported raw materials or machinery from abroad, as such materials or machinery must possess special specifications as stipulated in the contracts the company has with its clients. Consequently, at certain times, events may occur that affect changes in foreign exchange rates, both domestically and internationally. This could impact the company's project costs, which would fluctuate according to the volatility of exchange rates between the Thai Baht and foreign currencies such as USD and EUR. This could potentially cause the profit margins for those projects to deviate from the planned budget. | Changes in foreign exchange rates, both domestic and international, may impact the company's project costs, which are subject to fluctuations in the exchange rate between the Thai Baht and foreign currencies such as USD and EUR. This could result in the profit margins for such projects not aligning with the predetermined budget. | The company implements risk management by estimating raw material price volatility using historical project data. This estimation serves as a basis for current and future bidding projects. Additionally, procurement planning involves monitoring exchange rate fluctuation trends in various currencies. The company also compares the costs of forward foreign exchange contracts with exchange rate trends during the delivery period, providing an option to mitigate risks if exchange rates are likely to increase the company's costs. | 764 · Description: Fluctuation in exchange rates, interest rates, or the inflation rate · Info category: FINANCIAL_RISK |