Dividend Policy

Dividend Policy

The Company has a dividend payout policy rate of no less than 40% of net profit from the Company’s separate financial statements after the deduction of corporate income tax and legal reserve, and such payment shall not significantly impact the Company’s normal business operations. However, the Company may consider dividend payout which deviates from the aforementioned in line with the Company’s operating results, financial position, liquidity, business plan, other necessity in the future, and other factors related to management as the Board of Directors and/or shareholders deem fit. Such proceedings must be of greatest benefit to shareholders.

Historical Dividend Payments

This YearLast Year2 Years Ago3 Years Ago4 Years AgoMetricDescription
-0.85-0.820.690.650.45Net profit per share (Baht : Share)Net profit per share (baht : share)
000.210.20.16Dividend per share (Baht : Share)Dividend per share (baht : share)
00000Dividend stock ratio (Number of original shares: dividend shares)Ratio of stock dividend payment (existing share : stock dividend)
00000Dividend share value per share (Baht : Share)Value of stock dividend per share (baht : share)
000.210.20.16Total dividend payment value (Baht : Share)Total dividend payment (baht : share)
0030.730.747.04Dividend payout ratio to net profit (%)Dividend payout ratio compared to net profit (%)

Major Shareholders

Major Shareholders

No.NameShares% Shares
37,031TAKUNI (THAILAND) COMPANY LIMITED107,728,95036.63
37,032MR. KOBKUN THIENPREECHA45,000,00015.3
37,033UBS AG LONDON BRANCH29,002,7359.86
37,034MR. CHUNGSIK HONG25,689,6408.74
37,035MR. WANGYOUP JHEE5,183,4501.76
37,036Thailand Securities Depository Co., Ltd. for depositors.4,783,5401.63
37,037Thai NVDR Company Limited3,768,0811.28
37,038Mr.Vethin Photchanasunthorn2,547,7000.87
37,039Mr.Narong Wangcharoenwong2,437,5000.83
37,040MRS. KORNKAEW PATANAANAKE2,209,3000.75
37,041MR. YEONG CHEOL CHOI1,805,0600.61

Business Strategies Overview

Introduction

CAZ (Thailand) Public Company Limited (“the Company”) and its subsidiaries (“the Group”) are engaged in the construction service business, encompassing engineering design services, machinery and equipment procurement, and integrated construction project management. The Group is committed to operating to achieve its vision and mission and to meet the needs of customers in a variety of industries, especially customers who require high quality and international standards. The Group also supports investments by the government and private sectors, particularly in projects related to the Eastern Economic Corridor (EEC) development, which focuses on infrastructure and utilities development to enhance investment potential and economic activities in industrial estates. Additionally, the Group supports the growth of the real estate business in Chonburi, Rayong, and other areas in the Eastern region that are currently under the development plan of the Industrial Estate Authority of Thailand. The Group has strategies and goals to operate its business for sustainable growth.

Chairman's Message

Data pending
Data will appear once ingested from the 56-1 One Report filing.

Vision

“To be one of the leading construction service providers with competence and competitive potential, and to be a part of driving Thailand towards sustainable growth.”

Objectives

To be a leader in providing integrated construction contracting services (engineering, procurement, and construction) with competency and competitive potential, and to be a professional contractor for the construction, fabrication, assembly, and installation of steel products.

Goals

• To be one of the leaders in the integrated construction service business with capability and competitive potential with quality recognized both domestically and internationally.

• To be a leading provider of integrated construction services in the Asia-Pacific region.

• To provide modern tools and develop personnel capabilities to support future growth.

Business Strategies

• Develop and establish professional construction contracting service standards.

• Operational excellence, enhancing engineering service capabilities with standards, certified by the American Society of Mechanical Engineers (ASME), an internationally renowned institution.

• Plan and manage operating costs closely and continuously for stable and sustainable growth.

Material Changes & Developments

Material Changes & Developments

YearDescription
2,022
  • The company has been awarded construction contracts for the year with a total value of 1,337 million baht. The main projects include the Clean Fuel Project with a total value of 694 million baht, covering the scope of procurement, fabrication, and civil works; the Refinery Efficiency Improvement and Diesel Quality Improvement Project, covering the scope of procurement and fabrication of steel structures for Contract Package 1; and the Hydrogen Production Unit-2 Construction Project with a total value of 359 million baht.

  • The Group recognized revenue for the year totaling 3,135 million baht, marking the first year that revenue has reached the three billion baht level since its inception. As of December 31, 2022, the Group had a backlog of construction projects with a total value of 2,431 million baht.

2,023
  • The company improved the factory used for manufacturing and assembling structural systems located at the head office in Mueang District, Rayong Province, by installing a solar cell system in the factory. This utilizes solar energy from the installed Solar Roof to replace some of the electricity usage, promoting and reducing the use of fossil fuels and carbon dioxide emissions in the production process.

  • The company has signed construction contracts total value of 3,764 million baht. The main projects include the Clean Fuel Project with a total value of 1,697 million baht, covering the scope of procurement, fabrication of parts, civil works, structural installation, modification of parts, mechanical works, piping works, and procurement and fabrication of pipe parts. The Sakura project in the VCM / PVC area has a total value of 1,365 million baht, and the project to increase the production capacity of high-end propane products has a total value of 583 million baht.

  • The Group has a backlog of construction work as of December 31, 2023, with a total value of 3,320 million baht.

2,024
  • The Group recognized revenue of the year totaling 3,727 million baht. Backlog of construction work as of December 31, 2024, with a total value of 2,237 million baht.

  • The company has signed construction contracts for the year with a total value of 978 million baht. The main project is the Interconnecting Pipeline Metering System Improvement Project at LMPT1 and LMPT2 stations, with a total value of 978 million baht. The scope of work includes: procurement, fabrication, and civil works; structural installation; modification works; mechanical works; piping works; and pipe procurement and fabrication.

  • The company continues to develop and improve the solar cell system in the factory to promote and reduce electricity consumption and reduce carbon dioxide emissions in the production process continuously. This helps reduce greenhouse gas emissions, which are a major cause of global warming.

2,018
  • The Company transformed its status from CAZ (Thailand) Company Limited to CAZ (Thailand) Public Company Limited and increased its registered share capital by THB 40.00 million to support the offering of new shares to the public (IPO). In addition, the Company changed its par value from THB 100 per share to THB 0.50 per share. Resulting, the Company having registered capital of 280,000,000 shares, with a total paid-up capital of THB 100.00 million and 200,000,000 registered and paid-up shares.

  • The Company purchased 9,000 shares of JKEC, resulting in an increase in the Company’s shareholding portion in JKEC from 51.22% to 73.17%.

2,019
  • The Company offered to sell the newly issued shares to the public for the first time in the amount of 80,000,000 shares by selling the new shares to the subscribers at the price of THB 3.90 per share, totaling THB 312.00 million by the listed Company. And began to be traded on the Stock Exchange of Thailand on 22 January 2019.

  • The Company invested in land Buildings and factories in Pluak Daeng District, Rayong Province, with a total area ​​of 79 rai 47 square meters in the amount of THB 100.00 million to support company capacities of existing projects on hand and additional future projects.

  • The Company invested in additional 43,902 ordinary shares of JKEC (a subsidiary company) with a par value of THB 100 totaling THB 4,390,200 and still maintaining the proportion of investment in the subsidiary at the rate of 73.17%.

2,014
  • Established with initial registered capital of THB 28.50 million, comprising of 285,000 shares with par value of THB 100 per share. The Company began providing its services mainly as subcontractor for civil engineering work.

2,015
  • Issued 260,000 new shares for a total amount of THB 26.60 million to Takuni (Thailand) Company Limited (TT) as co-investor, accounting for 47.72% of paid-up capital. As a result, the Company’s paid-up capital amounted to THB 54.50 million, comprising of 545,000 shares with par value of THB 100 per share.

2,025
  • The Company has signed the Superstructure Work of the Map Ta Phut Industrial Port Development Phase 3 (Stage1) Project which contract value of 11,567 million bath. Scope of work are Construction and operation of the LNG terminal and regasification facilities on approximately 200 rai of reclaimed land (for the first phase of the LNG terminal).

  • The Group has a backlog of construction work as of December 31, 2025, with a total value of 11,504 million baht.

Use of Proceeds from Securities Offerings

Is There Money Raised from a Securities Offering Still to Report On?

Yes

Offerings

Type of SecuritiesType — Please SpecifyAmount Raised Given AsAmount Raised (Million Baht)Uses of the MoneyUsed as Declared?Progress / Reasons and Measures if Not Used as Declared
OtherConvertible Bonds of CAZ (Thailand) PCL. No.1/2025 Due 2027 with issuer's right of Early Redemption28731202025-12 · Objective: For use as short-term working capital. · Period type: 2871 · Start period: 2025-12 · Spent amount type: 2873 · Start spent amount: 120.0 · Expected amount type: 2873 · Start expected amount range: 120.0Y
OtherWarrant to Purchase Ordinary Shares of CAZ (Thailand) Public Company Limited No.1(CAZ-W1)287397.922030-12 · Objective: To be used for the working capital of the company · Period type: 2871 · Start period: 2030-12 · Spent amount type: 2873 · Start spent amount: 0.0 · Expected amount type: 2873 · Start expected amount range: 97.92N

In 2025, no conversion rights have been exercised on the company's share purchase warrants. These warrants are first exercisable on 13 January 2026, with an exercise period of five (5) years.

Law Governing the Debt Securities

Capital Market Supervisory Board Notification No. TorJor. 16/2565 Re: Application for and Granting of Permission to Offer Newly Issued Debt Securities

Commitments Made in the Registration Statement

Are There Commitments or Conditions from an Offering or Listing?

Yes

Commitments and How They Were Met

The issuer of the convertible debentures shall maintain a Net Debt to Equity Ratio, based on its annual consolidated financial statements, not exceeding 4:1 (four to one) as at the end of each accounting period throughout the term of the convertible debentures.

Group Operating-Structure Policy

Description

Business operations of TAKUNI Group and the Company may seem similar in the provision of construction service. However, the businesses of both parties differ in terms of expertise and standard of work. Thus, clients would decide to engage the services based on suitability for the job.

CAZ (Thailand) Public Company Limited operates its business as a construction service provider with its clients being large operators in the oil, gas, and petrochemical industry. This requires experience, emphasis on standards of raw materials, controlled manufacturing process, teams of engineers with expertise and understanding in various products able to advise clients, and teams of craftsmen standard-certified for welding various types of products, enabling the Company to ensure high-quality services with quality control exercised in every production and installation process. In addition, the Company received certificates of standard from renowned organizations such as ASME and NBIC, with regular checks every 3 years, resulting in a high cost of service

Takuni (Thailand) Company Limited (TT), which is TAKUNI’s subsidiary, like CAZ, also operates its business in construction service. However, the scope of the construction business is limited to LPG pipe construction system such as shopping centers, hospitals, and restaurants. In addition, the standards regarding construction, raw materials, and labor quality are at a level as required by law. As such, TT is not able to deliver standards comparable to CAZ due to limitations such as expertise other than in the LPG pipe system, engineers’ capabilities, and specialized labor qualifications.

However, should TAKUNI Group plan to engage the services of CAZ or CAZ’s subsidiary in the future in any matter, TAKUNI and CAZ will consider market prices, normal terms of trade, and appropriateness of the transaction. In such a case, The Audit Committee and internal auditor of both TAKUNI Group and CAZ will review such related party transactions, disclose information to the public, and proceed in accordance with the regulations on the matter.

Companies Where the Company Holds ≥10%

Companies (≥10% Holding)

Company NameAddressProvinceZip CodeTelephoneBusiness TypeSecurity TypeSharesPaid-up Shares
JKEC Co., Ltd239 Huaypong-Nongbon T.Huaypong A.MuangrayongRayong21150038-606-242Civil and foundation construction workCommon shares101,000101,000

Shareholders with Potential Conflict of Interest

Has Potential-Conflict Shareholder (Y/N)

No

Relationships Among Major Shareholders

Relationship Exists (Y/N)

Yes

Description

Major shareholders are divided into

1. Executives holding 11.11 percent of paid-up capital

2. Takuni (Thailand) Company Limited, a subsidiary of Takuni Group Public Company Limited, holding 36.63% of paid-up capital

Shareholders' Agreement

Agreement Exists (Y/N)

No

Shareholding Diagram (Group Structure)

Does the company hold shares in other companies?

Yes

Subsidiaries

Company NameJuristic Persons / Holders
JKEC Co., LtdCAZ (THAILAND) PUBLIC COMPANY LIMITED · Voting rights percent: 73.17 · Shareholding proportion percent: 73.17

Income Structure

Product / Service Income

CategoryDescriptionThis YearThis Year %Last YearLast Year %2 Years Ago2 Years Ago %
Total revenue from operationsTotal revenue from operations1,988,262.571003,726,795.071003,163,240.18100
Comprehensive construction services514,497.8525.88448,156.2112.0350,593.981.6
Construction, installation, structure and system services773,080.5338.882,463,112.6366.091,837,537.9858.09
Engineering Services30,580.861.54682,235.2618.31895,960.1328.32
General construction services632,152.1631.7916,335.080.44212,965.826.73
Production and Other Services37,951.171.91116,955.893.14166,182.275.25
OtherOthers000000

Export Income

CategoryDescriptionThis YearThis Year %Last YearLast Year %2 Years Ago2 Years Ago %
Total revenueTotal revenue1,988,262.571003,726,795.071003,163,240.18100
DomesticDomestic1,988,262.571003,726,795.071003,163,240.18100
InternationalInternational000000

Other Income

Operating Other IncomeNon-Operating Other IncomeShare of Profit
1710 · As of year: 73838.04 · Description: Total other income · As of yesteryear: 11527.04 · As of year before yesteryear: 3445.05 · 1711 · As of year: 0.0 · Description: Other income from operations · As of yesteryear: 0.0 · As of year before yesteryear: 0.01712 · As of year: 73838.04 · Description: Other income not from operations · As of yesteryear: 11527.04 · As of year before yesteryear: 3445.051713 · As of year: 0.0 · Description: Share of profit · As of yesteryear: 0.0 · As of year before yesteryear: 0.0

Product / Service Characteristics

Business Type

3115

Business Groups

Business GroupDescription
1. Engineering, Procurement and Construction (EPC) services

This comprehensive service encompasses engineering design, procurement of raw materials, machinery, and production equipment, and construction management. It also includes system and equipment testing, as well as integrated system testing before commissioning, all tailored to client specifications under a single service contract. These services can be categorized as follows:

1.1 Engineering Design: This service involves providing engineering design services tailored to client needs. The company employs a team of experienced engineers specializing in various disciplines, including civil, structural, architectural, mechanical, piping, electrical, instrumentation, and control systems. This expertise enables the company to undertake comprehensive engineering design projects for structures, civil works, and public utility systems within factories, meeting diverse client requirements.

1.2 Material and Equipment Procurement: The procurement of construction materials, machinery, and related equipment according to customer requirements and specifications. Procurement is limited to suppliers listed on the Approved Vendor List. This ensures construction and installation adhere to the established plan. The company manages price negotiations, purchase orders, delivery terms, and quality control. We verify that machinery and equipment meet customer specifications outlined in the contract and project plan.

1.3 Construction: This service encompasses construction contracting and the installation of engineering systems following the completion of engineering design and procurement of construction materials and equipment. The company assembles skilled construction teams tailored to each project type. These teams collaboratively manage project execution, including planning, coordination with clients or their representatives, subcontractors, equipment manufacturers and suppliers, and design engineers. We oversee and inspect construction work to ensure quality and timely completion according to the established schedule. Project management includes cost control, disbursement management, and workplace safety. The company offers contracting services ranging from civil works, building construction, steel structure fabrication and installation, piping work, mechanical work, electrical and instrumentation (E&I) work, to scaffolding and painting.

2. Structural Mechanical Piping (SMP) and Electrical and Instrument (E&I) Service

The Company provides contracting services for steel structure installation, piping and mechanical system installation, machinery and equipment installation, electrical work, instrumentation and control systems, including the testing process of systems and equipment, and the testing of the entire system before actual use. The services can be divided as follows:

2.1 Steel Structure Work: The Company will process the structure, procure materials, assemble, and install steel structures inside and outside buildings to support pipes (Pipe Bridge and Pipe Rack) and steel structures as bases for large machinery (Equipment and Machineries) in various industries such as oil refineries, petrochemical plants, and power plants, according to the customer's specifications before installation on site.

2.2 Mechanical Equipment, Tools, and Electrical System Installation Work: The Company will procure materials, assemble, and install equipment and machinery according to customer specifications.

2.3 Piping System Assembly and Installation Work: This includes the assembly, installation, and welding of pipes used to transport liquids and gases, such as oil and various solvents, according to specifications for industrial plants such as petrochemical plants, oil refineries, and power plants. In most cases, customers will prepare the pipes according to their needs, ordering them from abroad or importing them, as most of the pipes used cannot yet be produced domestically and are metal pipes with special properties, i.e., seamless pipes with large diameters and thicknesses than pipes used in other industries in general, ranging from Carbon Steel pipes, Stainless Steel pipes, to Alloy pipes using a variety of alloys ranging from steel, nickel, stainless steel, titanium, depending on the application requirements. Due to the aforementioned properties of the pipes, the assembly and installation of pipes requires special techniques and expertise, such as after welding, inspection by X-ray or heat treatment to relieve stress in the pipe material must be performed to obtain standard workpieces. Since these pipes are used in heavy industries, the level of pressure, heat, acidity, alkalinity, and continuous corrosion must be taken into account. If there are substandard workpieces, it may cause damage to the overall production process.

2.4 Electrical & Instrument Service: The Company will procure materials, assemble, and install equipment, tools, and electrical control systems according to customer specifications, including testing the entire system before actual use.

3. Civil and Building Service

The Company provides civil engineering services such as pile driving, foundation work, building structure, painting.

4. General Construction Service

The company provides civil engineering and steel structure services, including pile driving, foundation work, basic structure construction, and building construction. This encompasses steel structure work, piping systems, as well as machinery and equipment installation.

5. Fabrication and Other Services

The Company provides steel structure fabrication and assembly services, piping systems, heat exchange equipment, tanks, container fabrication, and pressure vessels, including raw material procurement and labor sourcing. Design, material and equipment procurement, fabrication and assembly, on-site installation, customer delivery. The Company's services are divided into

5.1 Shop Fabrication: The Company provides steel fabrication services into various types of steel structural parts by bringing steel sections, steel pipes, and steel plates, which are the main raw materials in production, to be cut, bent, welded, and assembled according to customer specifications, which vary in characteristics as follows:

i. Steel Structure: The Company will process the structure, procure materials, assemble, and deliver to customers.

ii. Piping: Including cutting, bending, or welding to the desired size and assembling pipes ready for installation according to the customer's specifications. After the welding is completed, it must be inspected by X-ray by a third party or heat treatment to relieve stress on the pipe material to ensure that the workpiece meets standards before delivering to customers.

5.2 Tanks Fabrication: The Company undertakes the production of liquid or gas storage tanks used in industrial plants, such as metal tanks, spherical tanks (Sphere Tank), etc. By bringing steel sections, steel pipes, and steel plates to cut, bend, roll, and weld metal plates into storage tanks according to customer specifications, most of which have a diameter of no more than 30 meters.

5.3 Pressure Vessel Fabrication: By cutting and assembling steel according to customer specifications, most of which are pressure vessels and pressure-resistant parts used in the petrochemical and gas industries, which must not leak or cause harm. The production is therefore complex and requires engineering expertise to achieve quality products that meet safety standards, such as industrial furnace structures and heat generating equipment structures (Furnace & Heater). The Company provides steel fabrication services into furnace structural parts, which will be used as heat generating equipment in various industries such as refineries, petrochemical plants, power plants, etc.

Research & Development

Has R&D Policy (Y/N)

No

R&D Cost — Label

Research and development (R&D) expenses over the past 3 years (Million Baht)

Assets Used in the Business

Permanent Assets — Description

1. Land

2. Buildings and Equipment

Intangible Assets — Description

Computer programs and various software applications

Has Subsidiaries Investment Policy (Y/N)

No

Subsidiaries Investment Policy — Description

The Company has one subsidiary, JKEC Co., Ltd. (“JKEC”), which was incorporated on January 29, 2015, with a registered capital of 2.00 million baht (20,000 shares with a par value of 100 baht per share). On October 1, 2019, JKEC increased its registered capital from 4,100,000 baht (41,000 shares with a par value of 100 baht per share) to 10,100,000 baht (101,000 shares with a par value of 100 baht per share). The Company maintained its shareholding in the subsidiary at 73.17 percent by subscribing for an additional 43,902 ordinary shares of JKEC at a par value of 100 baht per share, totaling 4,390,200 baht.

Marketing Policy & Competition

Reporting Mode

3117

Marketing Policy (Overall)

The Company has established its operational policy with a focus on expanding into the oil, gas, and petrochemical industries, which continue to grow in line with economic conditions. The Company has set an investment policy aimed at enhancing its production capabilities and developing its workforce, particularly skilled technicians who require a high level of expertise and proficiency, in order to remain competitive in the current environment. In addition, the Company is committed to maintaining high service standards to foster long-term relationships with its customers, while continuously improving its production capabilities to strengthen competitiveness and enhance the quality of its work across multiple dimensions. This enables the Company to deliver products and services of high quality in a timely manner. The Company has therefore established the following strategies and policies for its core business operations:

Product and Service Quality Standards
Given that the majority of the Company’s construction services are provided to large-scale industries, it is essential to select materials that meet specified standards and requirements. The Company places strong emphasis on quality control of both products and services, and has established a comprehensive quality assurance system covering every stage of the production and installation processes. This includes the implementation of Non-Destructive Testing (NDT), as well as inspection and certification procedures in accordance with international standards, customer requirements, and applicable legal regulations. These measures ensure that all aspects of the work meet required standards, achieve high efficiency, conform to specified technical requirements, and maintain safety for end-users and all related parties.

Product and Service Diversity
The Company has consistently been able to provide comprehensive, end-to-end solutions that effectively meet customer needs, delivering a high level of satisfaction and convenience. At present, the Company is capable of providing a wide range of construction services as described under “Nature of Products and Services.” The Company’s past performance has been well recognized by both project owners and main contractors, particularly leading large-scale companies, which have continued to place their trust in the Company and repeatedly engage its services.

On-time Delivery Works & Projects
In general, the Company requires approximately 4 to 24 months from the commencement of a contract to the delivery of work to customers, depending on the size and complexity of each project. The Company places strong emphasis on delivering products and services within the agreed timeframe, as this is a key factor influencing customers’ decisions in selecting construction contractors and manufacturers. To ensure timely delivery, the Company carefully evaluates procurement lead times for raw materials and estimates the duration required for each stage of the process prior to accepting any project. This ensures that the Company can complete and deliver work within the specified schedule. In addition, the Company has established a production control function to ensure that each stage of operations is carried out in accordance with defined standards and project plans. Furthermore, the Company has adopted modern technologies in its operations and continuously enhances the capabilities of its personnel through ongoing training and the promotion of effective teamwork. These efforts help reduce operational time and minimize potential errors, enabling the Company to deliver high-quality products and services in a timely manner in accordance with customer expectations.

Management Efficiency
The Company has established an effective management system and cost control framework, supported by the implementation of modern software systems to comprehensively manage construction projects. These systems enhance operational efficiency and reduce redundant processes, particularly in the Company’s construction activities.

The system enables real-time monitoring and control of material procurement volumes and project costs, allowing executives and project managers to access timely and accurate construction cost information. In addition, it supports project engineers in controlling the withdrawal and utilization of materials in accordance with the established project plans.

Furthermore, the adoption of technologies such as barcode systems and GPS tracking allows the Company to monitor project progress efficiently, reduce operational costs and time, and ensure that delivered work meets the required quality standards in accordance with customer specifications. This also enables the Company to complete and deliver projects within the agreed timelines.

Industry & Competition (Overall)

In 2025, the overall construction industry remained highly competitive, including increased competition from oversea contractors which high price competition. In addition, construction projects within the energy and petrochemical sectors require the highest standards of quality. The Company has adjusted its business strategies to align with the competitive environment by continuously developing its personnel, maintaining strict quality control, and effectively managing costs. Furthermore, the Company has strengthened its relationships with target customers, enabling it to sustain its competitiveness within the industry and consistently earn trust and confidence from its clients.

During 2025, the Company entered into an Engineering, Procurement, Construction and Commissioning (EPCC) contract as part of a joint venture between POSCO ECO & Challenge Co., Ltd. and CAZ (Thailand) Public Company Limited (the “PEC-CAZ Consortium”) for the Map Ta Phut Industrial Port Development Project Phase 3 (Phase 1), specifically for the gas terminal portion, with a total project value of Baht 11,567 million. As a result, the Group reported an outstanding backlog of Baht 11,504 million as of 31 December 2025.

Procurement of Products & Services

Reporting Mode

3117

Procurement (Overall)

The business support department will be responsible for selecting interesting projects by tracking project bidding announcements through various channels such as websites, newspaper announcements, television media, invitation emails from partners, phone calls for inquiries, etc. Bidding sometimes receives recommendations from customers who trust in the work, including recommendations from the Company's partners and trading alliances. The Company provides construction contracting services through 2 main channels as follows:

(1) Main Contractor

The Company uses the aforementioned channels as the main channels to approach customers for Construction Work by accepting work as a Sub-contractor from the Main Contractor, which is a large project contractor. The Main Contractor will proceed to bid for work in the form of a single contract from the Project Owner, which will cover from design, material and equipment procurement, and construction in large industrial plants. Then, the work will be divided to the Company or other Sub-contractors. In 2025, most of the Company's customers came from this channel. These Main Contractors include Gulf MTP LNG Terminal Co., Ltd., PTT LNG Co., Ltd., PTT Public Company Limited etc., which are considered leading large project contractors in Thailand and internationally with a long history and reputation.

(2) Project Owner

The Company has channels to directly contact Project Owners, who are operators with plans to expand investments, expand branches, expand production capacity, and/or improve existing projects. Most of the customers have a good relationship with the Company, being former customers who have used services in previous projects. The selection of contractors is usually done through bidding, where the Project Owner considers past performance and contacts the Company to submit a bid. Currently, the Company focuses more on accepting work directly with Project Owners to increase profitability, to increase the chances of getting ongoing work and build long-term credibility.

(3) Bidding Process

The bidding will be open, meaning that the agency that owns the project will open the bidding to interested parties in general. In the past, the number of bidders depended on the complexity and size of each project. In the case of procurement by special methods, the agency that owns the project will send invitation letters to only some companies to participate in the bidding by selecting from their capabilities, sales and service history. The Company has a business support department that is responsible for tracking bidding announcements through various media and then sending them to the price evaluation and estimation department to proceed with the bidding. Bidding sometimes receives recommendations from customers who trust in the Company's work, including recommendations from the Company's partners and trading alliances.

During the pre-bidding period, the Company will coordinate and contact customers to request bidding documents with important details such as TOR (Term of Reference), criteria, construction drawings, etc. To be used for studying information. The management will assign the Company's estimation department to study and extract the drawings to be used as guidelines in determining the price for the initial work proposal. The drawings must be extracted in terms of both quantity and unit price until a conclusion is reached. After that, the preliminary extracted drawings will be presented to the working team and management for joint consideration again before deciding whether to participate in the bidding. In case of participating in the bidding, the price for bidding will be considered and determined together. In the event that the Company is notified as the winner of the project bidding, the Company will hold a joint meeting with stakeholders such as project consultants, engineering teams, and company management to set a work plan. The Company will use the results of the meeting to determine guidelines for construction planning, material/equipment procurement planning, and labor hiring planning in accordance with the planned work schedule until the delivery of services to the customer is completed.


Procurement of materials and consumable

The Company does not have a policy to store raw materials, other material, and consumable for a long period. However, will procure according to necessity of use in order to control cost efficiently. These are complying with in each project, clients determine the specification of materials used. The Company’s inventory store mainly comprises of steel, which is the key material for the production of steel products such as steel plate and steel section, and thus are stored to reduce production time and facilitate prompt installation for clients.

Procurement process

1. Quotations survey and comparing price of raw materials from suppliers, during the bidding prior to the execution of contract with the clients. The Company will negotiate on the sourcing of raw materials. Clients usually determine the grade and specification of materials, as well as the client’s own supplier approved list. The Company will then conduct preliminary price examination from the supplier once the contract is executed.

2. After the Company signs contract with clients. The purchase order of materials is made directly from manufacturers and through distributors. Procurement of materials from abroad is done only for steel or certain materials which the clients have specifically identified and could not be sourced in Thailand. Procurement is done through Procurement Department of the Company in accordance with the process and allocated budget cost, with comparisons made in terms quantity, price, and the ability to deliver on time between different suppliers.

3. In every delivery, the Company’s Quality Control Division (QC) and the client’s representative will inspect the quantity and quality of the materials in accordance with the client’s requirements before use in the production process.

4. Consumable and other materials, the Company will plan the usage according to the construction phase and will keep stocks only for use as work scheduled requirement. By this method, it could help the Company reduce the procurement with large quantities of other materials and consumable. Also shall to prevent lose or damaged from any deteriorated.

In addition, the management will regularly monitor the construction budget cost of projects in order to have efficient costs with good qualities materials. During the past few years, the Company’s cost of raw materials is approximately 30% of the total cost. And also, most of the projects are construction and installation services for Structure Mechanical and Piping system. The main Contractor will be providing main raw materials, which are various steel products. The Company has to process those materials and to be installed at the construction site. Therefore, the Company has duty to procure only other related raw materials such as structural steel, rebar, welding wire and gas (together with various materials and tools used for welding steel), materials for electrical work, painting products and other consumables, etc., while civil engineering construction services The main raw materials used are Pre-mixed concrete, stone, sand, rebar, etc. While Civil engineering construction services, main raw materials used are concrete, stone, sand, rebar, etc.

Recruitment of Labor

The Company’s policy is to employ outsourced labor, namely those in civil construction and general construction such as paint, steel fabrication, and insulation. Outsourcing is a means to achieve lower labor costs as compared having an in-house unit, which would incur more expenses relating to salaries and benefits. The Company has engineers and control teams serving as full-time personnel, having had trainings and permits from the Council of Engineer as inspector engineer, to monitor and control all phases in the operation. The Company then employs outsourced labor to reduce costs and issues on labor quality.

In labor outsourcing, the Company will consider from experience and business profile especially from similar projects, quality of construction work, punctuality in project delivery, as well as readiness in terms of financial position. Moreover, the Company has set up a supplier list database to avoid reliance on any particular supplier.

Product Information — Overview

Introduction

The Company has experience and expertise in all types of engineering and construction. The Company undertakes construction contracts for customers in the oil, gas, petrochemical, and industrial industries. The Company's work and services are divided into 5 main categories:

1. Engineering, Procurement and Construction (EPC) Service: The scope of services covers engineering design, procurement of materials, machinery and production equipment, and construction management, including the testing process of systems and equipment, and the testing of the entire system before actual use, according to the needs of customers under a single service contract. The services can be divided as follows:

2. Structural Mechanical Piping (SMP) and Electrical and Instrument (E&I) Service: The Company provides steel structure installation, piping and mechanical system installation, machinery and equipment installation, electrical works, instrumentation and control systems, including the testing process of systems and equipment, and the testing of the entire system before actual use. The services can be divided as follows:

3. Civil and Building Service: The Company provides civil engineering works such as pile works, foundation works, building structure works, painting works.

4. General Construction Service: The Company provides civil engineering and steel structure works, including pile works, foundation works, infrastructure works, building works, which cover steel structure works, piping systems, including machinery and equipment installation.

5. Fabrication and Other Service: The Company provides fabrication and assembly of steel structures, piping systems, heat exchangers, tanks, container processing, and pressure vessels fabricatoin, including material procurement and labor services.


Projects Under Construction

Has Projects Under Construction (Y/N)

Yes

Description

In 2025, the Group had four ongoing construction projects that had not yet been delivered, with a total contract value of Baht 15,144.97 million. Of this amount, Baht 3,640.78 million, or 24% of the total contract value, had been recognized as revenue. Approximately 4.94% of the total contract value is expected to be delivered within 2026, with the remaining balance scheduled for delivery by 2029. As of 31 December 2025, the Group’s construction backlog totaled Baht 11,504.19 million.

Total Projects

4

Total Project Value

15144967124.92

Recognized Value

3640777490.02

Remaining / Unrecognized Value

11504189634.9

Projects

Project NameDescriptionValueIncome %Est. YearsEst. MonthsEst. Completion
Clean Fuel Project Steel Structure / Equipment / Piping Works
- The value of work shown is the value of work that has not yet been recognized as income (Backlog) - The Company is currently in the process of delivering construction materials under the project following the final settlement of the construction contract.
299.99412025-09-01
PTTLNG Interconnecting Pipeline-Metering System Modification Project, management system for interconneting pipeline between LMPT1 and LMPT2 Stations
The value of work shown is the value of work that has not yet been recognized as income (Backlog)
56042.68202026-09-01
The Superstructure Work of the Map Ta Phut Industrial Port Development Phase 3 (Stage1) Project
The value of work shown is the value of work that has not yet been recognized as income (Backlog)
10,9355.46392029-04-01
Miscellaneous project
The value of work shown is the value of work that has not yet been recognized as income (Backlog)
653.09202026-09-01

Debentures & Bills of Exchange

Has Debentures (Y/N)

Yes

Debentures

Debenture NameInterest Rate (%)OutstandingMaturity DateTermTypes
The Convertible Bonds of CAZ (Thailand) Public Company Limited No.1/2025 Due2027 Wht the Issue's Rights of Early Redemption61202Decmeber 2027 or the next business day if such day is not a business day2years from the date of issuance of Convertible Bonds2792 · Description: Convertible bonds

Convertible Securities

Has Convertible Securities (Y/N)

Yes

Convertible Securities

Security NameIssued DateExercise Date(s)Maturity DateExercise PriceExercise RatioAllotted SharesConvertible SharesUnconverted SharesRemaining ConvertibleNotification Period
Warrant to purchase ordinary shares of CAZ (Thailand) Public Company Limited2025-12-16-The first exercise can be made upon the completion of 1 month from the Issue and Offering date of Warrant no.1 -Holder of Warrant No.1 can exercise their rights on the 15th and the last day of every month. -After 4 months, holder can exercise their right on the 15th until the expiry of Warrant No.12030-12-150.81.000:1.000122,400,000122,400,000122,400,000122,400,000The holder of Warrant No.1 who intend to exercise their rights must notify their intention to exercise their right between 8.00 a.m.- 5.00 p.m. within 2 business days prior to each exercise date. For the last exercise period, the last notification period within 15 business days.